Automation Service

PLC Upgrades & Migration
Without Stopping Production

If your line still runs on an obsolete PLC, the risk grows every year: spares get harder to find, the old programming software won't run on modern laptops, and the people who understood the code move on. We replace legacy control systems with current, supported platforms in planned, phased stages, so you upgrade on your terms rather than after a breakdown.

Vendor NeutralPhased CutoversTested Before Site
Is It Time?

Signs Your PLC Needs Upgrading

Legacy control systems rarely fail all at once. The warning signs build up quietly, and most of them are visible long before a breakdown.

Spares are hard to find

Your PLC is no longer made, and replacement cards come from refurbishers or eBay. When a critical card fails, you could be down for days while someone hunts for a compatible part.

Only one laptop can talk to it

The programming software needs an old operating system, and the one machine that still runs it is getting older too. If that laptop fails, the program may be out of reach entirely.

Nobody fully understands the code

Years of quick fixes, no documentation, and the engineers who wrote it have retired or moved on. Fault finding turns into hours of guesswork every time the line stops.

Safety and security have moved on

Older systems often pre-date current machinery safety standards such as ISO 13849 and IEC 62061, and have no network security at all, which matters more as sites become more connected.

We look at how this shows up in your downtime figures in Unplanned Downtime Is an Obsolescence Problem.

Common Migration Paths

Obsolete PLCs We Replace

We work across Siemens, Rockwell Allen-Bradley, Mitsubishi, Beckhoff, Omron and Schneider, so we can read the old system and recommend the right replacement for your site rather than for a particular brand.

Legacy systemTypical replacementWhy sites are moving
Siemens S5Siemens S7-1500 / TIA PortalLong discontinued, spares increasingly scarce, and the original programming tools are hard to run today.
Siemens S7-300 / S7-400Siemens S7-1500 / TIA PortalBeing phased out by Siemens. Planning the move now avoids a rush when spares dry up.
Allen-Bradley PLC-5 / SLC 500ControlLogix or CompactLogix / Studio 5000Discontinued by Rockwell, with support and spares increasingly limited.
Legacy ModiconRockwell ControlLogix, Siemens or current SchneiderAgeing hardware, shrinking knowledge base, and often no usable documentation.
Older Mitsubishi, Omron and othersCurrent platform from the same or a different vendorChosen around your installed base, engineer familiarity and long-term support.

Not sure what is in your panels? That is exactly what a free line review establishes. For more on choosing a platform, see Modernise Legacy Control Systems.

How We Work

How We Upgrade Without Stopping Your Line

The risk in a PLC migration is managed through preparation. By the time we touch your line, the new panels and software have already been tested.

1

Audit & Prioritise

2

Document the Existing System

3

Design & Offline Software

4

Panel Build & FAT

5

Phased Cutover

6

Training & Handover

Document before we change anything

We capture the existing control logic, I/O mapping, HMI screens and the undocumented behaviour that has built up over years of running. That record is valuable on its own, whatever you decide next.

New software built and tested offline

The new PLC software is written against that baseline, with clearer structure and better diagnostics, and bench tested module by module. Where it helps, we virtually commission the sequence against a digital model first.

Panels factory tested before delivery

Replacement control and power panels are designed by our electrical engineers, then built and factory acceptance tested before they go anywhere near your line.

Cut over in stages, on your schedule

Sections of the line move across one at a time during weekends, night shifts or planned shutdowns, with a Duke engineer on site throughout, while the rest of the line keeps producing.

More detail on phased module swaps, shadow testing and code clean-up is in Reviving Legacy PLCs.

Case Study

Modicon to Rockwell on a Live Automotive Line

A major UK automotive manufacturer in the West Midlands was running production-critical conveyors on Modicon systems installed in the 1990s, with no vendor support, scarce spares and no usable documentation. We were appointed to replace every legacy control and power panel with a Rockwell ControlLogix 1756-L83E platform, covering electrical design, panel manufacture, PLC programming and phased commissioning in-house.

The logic was interpreted and rewritten from scratch, every panel was factory tested, and each cutover was rehearsed before going live. The programme is due to complete in December 2026, and there has been no unplanned downtime at any point so far.

Read the Case Study
200m+Live production conveyor
ZeroUnplanned downtime
12Engineers at peak
12 moProgramme duration
Every intervention on a live production site carries risk. The way you manage that risk is through preparation. By the time our engineers went live on each phase, the panel had been factory tested, the code had been bench tested, and the cutover sequence had been rehearsed.
Duke Control Systems project team
Why Duke

Why Manufacturers Trust Us With Legacy Upgrades

Vendor Neutral

We recommend the platform that suits your site, your engineers and your long-term support needs, not the one that is easiest for us.

Design to Commissioning In-House

Electrical design, panel build, software and site work under one team, with one point of responsibility.

Live Brownfield Experience

Upgrades on running production lines in automotive, FMCG, logistics and life sciences, where keeping the line moving was the priority.

A System Your Team Can Maintain

Structured, documented code with proper diagnostics, and training for your maintenance engineers at handover.

FAQs

PLC Upgrade Questions

Can you upgrade our PLC without stopping production?

In most cases, yes. We develop and test the new software offline, factory test the panels, and then cut sections of the line across one at a time during weekends, night shifts or planned shutdowns, so the rest of the line keeps running. On our current Modicon to Rockwell migration for an automotive manufacturer, there has been no unplanned downtime at any point.

What if we have no documentation or source code for the old PLC?

That is common, and it does not stop the project. We start by documenting the existing system: control logic, I/O mapping, HMI screens and any undocumented behaviour that has built up over the years. On our automotive migration the original system had no usable documentation, so the logic was interpreted and rewritten on the new platform with all of the original functions preserved.

Which PLC platform should we move to?

It depends on your installed base, what your maintenance engineers already know, integration with other equipment, long-term support and safety requirements. We are vendor neutral and work across Siemens, Rockwell Allen-Bradley, Mitsubishi, Beckhoff, Omron and Schneider, so we recommend what suits your site rather than a particular brand.

Do we have to replace everything at once?

No. Most sites do not need a mass upgrade programme. We help you rank systems by risk and impact, looking at age, support status, spares availability and how critical the machine is, so you tackle the systems that matter most first and plan the rest around your production schedule.

How do we find out where our biggest PLC obsolescence risk is?

Book a free production line review. A senior engineer visits your site, reviews your control systems and gives you a written report with specific, prioritised recommendations. There is no cost and no obligation to proceed.

Further Reading

Guides on Legacy Control Systems

Find Out Where Your PLC Risk Sits

A senior engineer will walk your site, review your control systems and give you a written, prioritised view of what to upgrade first. No cost, no obligation.